Home / Blog / CE and FCC Certification Compared

CE and FCC Certification for Robot Mowers: What Each Mark Covers and When You Need Both

CE and FCC are the two marks buyers ask about most, and the two get conflated more than almost any other pair in this category. They check different things, for different markets, under different legal frameworks. This guide separates what each one actually covers so a quote can be scoped correctly from the start.

EU Market

CE marking — what it actually certifies

CE marking on a robotic mower is a declaration that the product meets the relevant EU directives, not a single test. For this category that typically means the Machinery Directive 2006/42/EC, which requires a technical file (Annex VII) referencing EN 50636-2-107 for mower-specific safety; the Low Voltage Directive (LVD), covering the electrical safety of the battery and charging system; and RoHS, which restricts hazardous substances in the electronics.

A supplier that says a model "has CE" should be able to show which of these the declaration actually covers and for which SKU. CE is required for any robotic mower category sold in the EU — wire-free navigation, perimeter wire-guided, commercial zero-turn, crawler/tracked slope and remote-controlled models all need it, though the specific technical file content varies by category.

US Market

FCC — when wireless connectivity triggers it

FCC certification is a US requirement for devices that transmit or receive radio-frequency signals. For robotic mowers, that means models with WiFi app connectivity, GPS/RTK positioning modules, or Bluetooth pairing. A unit with any of these wireless components shipping to the US typically needs FCC equipment authorization for that radio module.

This is where the comparison with CE gets confusing, because FCC is not a general product-safety mark the way CE partly is — it is specifically about RF emissions and interference. A purely mechanical, non-connected wire-guided model without any wireless radio may not trigger an FCC requirement at all, while a GPS/RTK wire-free navigation model almost certainly will because the positioning module itself is a radio device.

Comparison

CE vs FCC, side by side

Putting the two next to each other makes the scope difference clearer than treating them as interchangeable boxes to check.

AspectCEFCC
MarketEU / EEAUnited States
Legal basisMachinery Directive 2006/42/EC, LVD, RoHSFederal Communications Commission RF regulations
What it checksMechanical and electrical safety, hazardous substancesRadio-frequency emissions and interference
Applies toAll mower categories sold in the EUOnly models with a wireless/radio module
Companion standardEN 50636-2-107 (mower-specific safety)Frequency/emissions test report for the specific radio module
Beyond CE and FCC

Other markets buyers often overlook

CE and FCC cover two of the most frequently cited export destinations for this category, but they are not the whole picture. The UK runs its own parallel framework — the Supply of Machinery (Safety) Regulations 2008 — which mirrors the EU Machinery Directive in structure but is a separate legal requirement since the UK is outside the EU conformity system. A CE-marked unit is not automatically compliant for UK sale without the corresponding UK documentation.

In the US, FCC sits alongside a separate safety standard: ANSI/OPEI 60335-2-107-2019, the US national adoption of the IEC robotic mower safety standard. FCC addresses radio compliance; ANSI/OPEI addresses the same category of mechanical and electrical safety that EN 50636-2-107 covers in the EU. A model fully cleared for the US market typically needs both, not just FCC alone.

Buyer Checklist

What to request before committing to a PO

Four things are worth asking for before a purchase order is confirmed. First, test reports or declarations of conformity that reference the specific SKU, not a general factory claim. Second, confirmation of exactly which wireless modules are embedded in that SKU, since that determines FCC and Radio Equipment Directive scope. Third, confirmation that the documentation's issue date and scope match the production batch being quoted, not an older model revision. Fourth, a realistic timeline for when that documentation will be available relative to your production schedule, since certification testing can run in parallel with tooling but not always with final assembly. Treating these four items as a standing checklist for every new SKU, rather than a one-time check on a first order, is what keeps a growing catalog from drifting out of compliance as models get added or revised.

FAQ

Common questions on CE and FCC

Does a mower need both CE and FCC?
Only if it ships to both the EU and US markets. Each mark applies to its own jurisdiction and reflects different requirements, so a model sold only in one market typically needs only that market's mark.
Does CE cover radio-frequency emissions?
The Machinery Directive and LVD do not cover RF emissions on their own. EU models with wireless modules typically also fall under Radio Equipment Directive requirements, confirmed per model based on which wireless components are installed.
Is FCC certification needed for a wire-guided mower with no app?
If the unit has no wireless radio module, FCC equipment authorization typically does not apply. This is confirmed per SKU, since wire-guided lines increasingly add optional app connectivity.
Who issues CE and FCC certifications?
Accredited test labs and standards bodies issue them against a specific product and factory. MowHub coordinates which partner factory's documentation applies and confirms it before shipment, rather than issuing certificates directly.

Not sure which markets your order needs to clear?

Tell us your target markets and connectivity requirements — we confirm which certifications apply to the exact SKU before you quote.

Request a Quote
Related Reading

Continue researching certification and sourcing

EN 50636-2-107 Explained

The EU safety standard behind the Machinery Directive technical file.

Read the guide →

Finding a Manufacturer in China

A due-diligence checklist for verifying factory and documentation claims.

Read the guide →

MOQ and Lead Time Explained

Pilot orders versus standard production runs, and the sampling-to-shipment timeline.

Read the guide →